Please view the video below for the SCM Annual Inspection Process. All inspections are required to be completed using the electronic process.
View larger map
A North Carolina Licensed Professional Engineer or Landscape Architect must complete the Annual Inspection.
All inspections shall be completed through the electronic process on the City website.
All annual inspections shall be completed between April 1 and June 30.
The recommended repairs from the licensed professional must be started within 30 days and completed within 60 days. After the repairs are completed, a new inspection shall be completed by the licensed professional.
If the SCM you’re trying to inspect doesn’t show up, please email byost@kannapolisnc.gov and the point will be added.
A minimum of 4 photos are required.
You must click the dot on the map that corresponds to the appropriate SCM.
If you have specific questions, please contact Brent Yost at byost@kannapolisnc.gov or 704-920-4203.
Paper copies are not accepted. Applicants must use the online portal for submittals.